MBC Summer '06 Campus Improvements

7/28/06 - The newly painted Spencer Lounges now sport new carpeting.

7/28/06 - The steam line is recovered after repairs and the ground is graded and ready for grass.

7/28/06 - The gym floor in PAC is sanded to bare wood and awaiting the painting of the MBC logo.

7/20/06 - Replacing columns on the Tullidge portico.

7/20/06 - The newly painted Spencer Lounges.

Spencer lounge repainted

7/16/06 - A new emergency generator between Wenger and Hill Top means the phone system and server stay operational in power outages.

7/9/06 - A crane is brought so painters can reach the top of Memorial Residence Hall.

7/7/06 - Rose Terrace windows are re-glazed

7/7/06 - Crews take down a tree in front of the Coalter Street House

7/07/06 - Wood trim replaced on Rose Terrace

7/07/06 - Welding the new steam line